欧宝(首页)体育张信哲-百度百科

Capacity building

Yipeng Energy has formed a complete industrial chain integrating lithium battery cells, battery systems (Pack) and waste battery recycling. It has 2 production bases in Ganzhou and Huizhou; Ganzhou base is mainly based on battery cell production and manufacturing, Huizhou base Mainly produce battery systems (Pack).

b61397b4cc35a355868212a48a903df.png

Yipeng has 455 people, including 78 professional R&D technicians; 3 doctors and 150 undergraduates; the R&D team is composed of battery and BMS experts who have returned from overseas. The fast-charge lithium-ion power battery is the mainstream manganese The high-performance lithium-ion battery developed on the basis of acid lithium battery technology has a leading domestic technical performance; BMS adopts the advanced international real-time dynamic adaptive technology to ensure the safety, reliability and long life of the battery system. Through continuous technological improvement, product performance and quality have reached the advanced level of the industry

image.png

At present, the first phase of the Ganzhou base has an investment of 200 million yuan, a production plant area of 24,000 square meters, and 2 production lines with an annual production capacity of 0.5GWh. It will be put into operation in early 2019; the second phase of the project is expected to have a total investment of 1 billion yuan and a total area of 100 mu. Build 12 production lines, with an annual production capacity of 2.3 GWh after reaching full capacity, and will be fully put into operation in 2020.

image.png

At present, the first phase of the Ganzhou base has an investment of 200 million yuan, a production plant area of 24,000 square meters, and 2 production lines with an annual production capacity of 0.5GWh. It will be put into operation in early 2019; the second phase of the project is expected to have a total investment of 1 billion yuan and a total area of 100 mu. Build 12 production lines, with an annual production capacity of 2.3 GWh after reaching full capacity, and will be fully put into operation in 2020.

XML 地图